New hydropower plants for Uzbekistan

Premium Content

01 June 2020

Aksu river Uzbekistan

The Energy Ministry of Uzbekistan has launched a bidding process for the design and construction of three hydroelectric power plants (HPP) along the country’s Aksu river.

The move follows the government’s announcement last month that it was launching a low-carbon energy strategy, which includes the development of an extra 30GW of renewable capacity, aimed at reducing greenhouse gas emissions by 10% in the next 10 years.

The project to develop the three hydropower plants, to be built in the Qashqadaryo province in the southeast of Uzbekistan, has been made possible by support from the Asian Development Bank.

For this reason, the tender process is open only to companies from ADB member states, and only to those with an annual turnover of at least US$30 million (€27 million).

All tenders must be received by 31 July this year.

How to influence construction buyers in an AI world
The buyer journey is now more complicated than ever before, thanks to the AI world. What should construction marketers do to reach their buyers?
A smart cold play: How cold milling can offer a better bottom line for Latin American road contractors
Faced with tight margins, operator shortages and calls for more operational transparency, highway contractors are embracing digitalisation in their cold milling applications
How smarter milling can boost productivity for Latin American road contractors
As contractors across the region face tighter margins, operator shortages and growing demands for transparency, automation and digitalisation are becoming increasingly important in cold milling operations