New hydropower plants for Uzbekistan

Premium Content

01 June 2020

Aksu river Uzbekistan

The Energy Ministry of Uzbekistan has launched a bidding process for the design and construction of three hydroelectric power plants (HPP) along the country’s Aksu river.

The move follows the government’s announcement last month that it was launching a low-carbon energy strategy, which includes the development of an extra 30GW of renewable capacity, aimed at reducing greenhouse gas emissions by 10% in the next 10 years.

The project to develop the three hydropower plants, to be built in the Qashqadaryo province in the southeast of Uzbekistan, has been made possible by support from the Asian Development Bank.

For this reason, the tender process is open only to companies from ADB member states, and only to those with an annual turnover of at least US$30 million (€27 million).

All tenders must be received by 31 July this year.

Parked in plane sight: Why GSE fleets rely on large spark-ignited engines
Examining how proven technology can help airport fleets balance uptime, cost, flexibility and lower emissions
Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity