Italian Army takes on CTE platforms

Premium Content

14 January 2013

The Italian Army has ordered 10 ZED 20 CSL truck-mounted aerial platforms from local manufacturer CT

The Italian Army has ordered 10 ZED 20 CSL truck-mounted aerial platforms from local manufacturer CTE

CTE is preparing to deliver 10 ZED 20 CSL truck-mounted aerial platforms to the Italian Army.

The trucks, installed on Iveco Daily 5-ton trucks, are liveried in military colours but intended for commercial use.

Offering a working height of 20m and a working outreach of 9.2m, the ZED 20 CSLs have a single loading capacity of 230 kg.

The platforms are fitted with an anti-collision system and an adjustable light system in the basket, and come with a single multifunction key. The fleet was also fitted with special equipment as requested by the military.

The order is to be delivered to the Italian Army at Peschiera del Garda and Forlì in mid January.

WorkDry invests in pump fleet in preparation for extreme events
Company adds hundreds of new pumps in anticipation of extreme El Niño weather events.
Chinese gains reshape South American market
Chinese construction equipment manufacturers are becoming an established competitive force in South America rather than simply a low-cost alternative, according to a white paper from Off-Highway Research
Smarter by design: How intelligent excavators are delivering better jobsite results
Integrated technology is helping contractors improve accuracy, productivity and control without neglecting the fundamentals of machine performance