Explosives bring down 3,800-tonne mining ‘monster’

Premium Content

RWE Power, part of energy company RWE Global, has used explosives to dismantle a rather unique, 3,800-tonne mining “spreader”.

The blast flashpoint on the spreader machine (PHOTO: IMAGO/Beautiful Sports via Reuters Connect)


Originally designed and built as a lignite excavator in 1961 for the Garzweiler Opencast Mine in North Rhine-Westphalia, Germany, the “spreader” was later adapted to operate as a mining materials stacker. 

A few years later, it was re-engineered again, to serve as a spreader at RWE’s nearby Hambach Opencast Mine.

After 42 years in ‘diverse’ operation and finally at the end of its useful working life, the 47-metre-high, 148-metre-long contraption was recently taken down via an explosive event carried out at the Hambach mining site.

RWE used 300 charges, containing a total of around 27 kg of explosives, to bring down the machine, which through all its adaptions still retained its original excavator chassis.

EXCLUSIVE: Jet Demolition’s 3 most difficult implosive projects Kate Bester details the complexities of taking down giant structures in the some of the world’s most populous cities 

Engineering certainty: Lift planning’s expanding role in heavy industry
Driven by tighter critical lift procedures, heavier loads, and shrinking field experience, lift planning now sits at the center of construction execution
Istanbul – the world’s next meeting place
Levent Baykal, organiser of Komatek, the largest construction exhibition in Türkiye, talks to KHL’s Content Studio about his plans to put people at the heart of the show
The future of off-highway power is about integration, not just innovation
OEMs face growing complexity in powertrain decisions – but clarity is emerging around efficiency and uptime