Sarens Transports and Installs the Boston Barrier

17 February 2020

164727_20191105_121603

The Boston Barrier installed across the River Witham (or Havne) will help protect more than 14.000 properties making Boston one of the best protected towns against tidal flooding on the east coast. A new control building will operate the barrier and there are flood defence walls on both banks and replacement gates across the entrance to the existing Port of Boston dock.

Sarens was commissioned by Hollandia Infra to transport the Barrier from Krimpen aan den Ijssel, the Netherlands, where it was fabricated, to Boston and finally install it. 

Extreme current due to the tidal work on the river had to be incorporated during the planning phase. The client had created a temporary bridge to install the barrier to its final position which had to be lifted along with the Barrier. Considering all the points our teams decided to deploy SPMT’s, supports, load spreading mats, modular beams, and PJ250. 

Sarens scope included:

  • SPMT transport and load-out of Barrier in the Netherlands
  • Stooling on top of SPMT
  • Water transfer from Netherlands to the UK 
  • Temporary bridge construction in Barrier Basement
  • SPMT transport and load-in of the Barrier
  • Jacking-up of the Barrier

The installation site was near a residential area, leaving a very confined space. The team unloaded the equipment on a laydown area, 2 streets away from the final jobsite. Heavy rains added to the challenge.

Once the Barrier, weighing 290T and measuring 30mx10mx3m, was moved to the installation site along with the temporary bridge structure it was safely jacked up to its final position.

According to the Project Manager, Willem Ditmer, “The client was very impressed with the performance of our team and the precisely chosen equipment that fitted like a glove on this job.” 

Latest News
ARA forecasts “soft landing” at Working at Height Conference
Chief economist shares forecasts with Working at Height at delegates in Nashville yesterday 
Wolff tower cranes work out in Norway
Five flat top tower cranes are helping to rejuvenate an industrial district of Oslo
NessCampbell debuts North America’s first Grove GMK6450-1
NessCampbell Crane + Rigging partnered with Western Towboat to assemble a new towboat at its Seattle facility.