New Korea bridge inspection

Premium Content

15 March 2019

Korea bridge

An underbridge inspection unit has been supplied to Korea Infrastructure and Safety Corporation in South Korea for the inspection and maintenance of a new bridge on the Jinju City river.

Manufactured in Italy by Barin and assembled on a Scania P410 LB 8x4 truck chassis, the AB 20SL/B4T model occupies one lane, either in transport or work configuration, allowing traffic to traffic flow on the second lane. The AB model can work underbridge and overhead, like an aerial platform.

The model has a bridge barrier clearance 4.6m, sidewalk clearance of 4.4m, horizontal outreach underbridge of 20m, vertical depth underbridge of 24.5m, with a basket capacity 280kg. GVW 35 is tonnes.

 

 

 

The changing role of power units in off-highway equipment
Isuzu describes how pre-validated systems can lighten the engineering load for OEMs
How installation determines alignment success in rotating machinery
Roman Megela explains the impact of installation quality on machine reliability, energy-efficiency and sustainability
Building the intelligent mine: Why integration will define mining’s next era
Yu Xiao Ying, Head of Smart Mining Projects at Zoomlion on how and why mining is entering a period of profound transformation