New Korea bridge inspection

Premium Content

15 March 2019

Korea bridge

An underbridge inspection unit has been supplied to Korea Infrastructure and Safety Corporation in South Korea for the inspection and maintenance of a new bridge on the Jinju City river.

Manufactured in Italy by Barin and assembled on a Scania P410 LB 8x4 truck chassis, the AB 20SL/B4T model occupies one lane, either in transport or work configuration, allowing traffic to traffic flow on the second lane. The AB model can work underbridge and overhead, like an aerial platform.

The model has a bridge barrier clearance 4.6m, sidewalk clearance of 4.4m, horizontal outreach underbridge of 20m, vertical depth underbridge of 24.5m, with a basket capacity 280kg. GVW 35 is tonnes.

 

 

 

Panel announced for ‘Hidden Cost of Heat’ webinar
Experts will discuss how smarter cooling can improve uptime, reduce costs and boost equipment performance
The new power equation
As fuel and engine options expand, OEMs are taking a more strategic approach to matching power with application
Alternative fuels: The importance of overcoming contamination
How good fuel management and advanced filtration can help fleets adopt lower-carbon fuels without sacrificing uptime or component life.