ai01020719.xml

Premium Content

15 April 2008

Hek mast climbers on the new 185 m high customer services building being built for the Emirates Telecommunications Corp in Dubai, UAE. Ten Hek MSM Super mast climbers, supplied by Al Laith Scaffolding to main contractor Dhabi Contracting, are being used to install the heavy granite panels on the sheer walls of the tower. The glass panel sections are being installed from inside the building. The MSM units comprise six single–mast platforms at heights of up to 185 m and two twin–mast units up to 80 m. Anchoring is at 8 m centers.

Smarter by design: How intelligent excavators are delivering better jobsite results
Integrated technology is helping contractors improve accuracy, productivity and control without neglecting the fundamentals of machine performance
Choosing the right AWP for a constrained jobsite
A look at how site restrictions and task requirements inform aerial platform selection
The right tire for the right application
When the demands of a jobsite dictate tire selection, field knowledge and data are key to optimising fleet performance