ai01020719.xml

Premium Content

15 April 2008

Hek mast climbers on the new 185 m high customer services building being built for the Emirates Telecommunications Corp in Dubai, UAE. Ten Hek MSM Super mast climbers, supplied by Al Laith Scaffolding to main contractor Dhabi Contracting, are being used to install the heavy granite panels on the sheer walls of the tower. The glass panel sections are being installed from inside the building. The MSM units comprise six single–mast platforms at heights of up to 185 m and two twin–mast units up to 80 m. Anchoring is at 8 m centers.

Modapower targets the North American power gap
An object lesson in adapting gensets to local rules, applications and lead-time pressures – key factors in a successful market entry
Building operational resilience in industrial engine applications
The hidden costs of equipment downtime start long before failure
Parked in plane sight: Why GSE fleets rely on large spark-ignited engines
Examining how proven technology can help airport fleets balance uptime, cost, flexibility and lower emissions