ai01020719.xml

Premium Content

15 April 2008

Hek mast climbers on the new 185 m high customer services building being built for the Emirates Telecommunications Corp in Dubai, UAE. Ten Hek MSM Super mast climbers, supplied by Al Laith Scaffolding to main contractor Dhabi Contracting, are being used to install the heavy granite panels on the sheer walls of the tower. The glass panel sections are being installed from inside the building. The MSM units comprise six single–mast platforms at heights of up to 185 m and two twin–mast units up to 80 m. Anchoring is at 8 m centers.

New Skyjack boom for China/Southeast Asia markets
Deliveries of the SJ22 TE+ scheduled to begin in August from Skyjack’s facility in Tianjin 
Product analysis: what’s next for boom lifts?
Electric and hybrid lifts continue to influence, however uptime and productivity remain key to product design 
How robotics are shaping the access sector
Manufacturers are taking a leap forward with intelligent robotic lifts capable of carrying out increasingly complex tasks with minimal human intervention