ai01020719.xml

Premium Content

15 April 2008

Hek mast climbers on the new 185 m high customer services building being built for the Emirates Telecommunications Corp in Dubai, UAE. Ten Hek MSM Super mast climbers, supplied by Al Laith Scaffolding to main contractor Dhabi Contracting, are being used to install the heavy granite panels on the sheer walls of the tower. The glass panel sections are being installed from inside the building. The MSM units comprise six single–mast platforms at heights of up to 185 m and two twin–mast units up to 80 m. Anchoring is at 8 m centers.

Will fuel-agnostic engines power the next era of construction?
Flexible engine platforms are emerging as a way to balance performance, flexibility and future regulatory demands
Beyond torque: The challenge of power management for crushing equipment
How OEMs and operators are managing to maximise uptime for equipment that has to pass the ultimate stress test on a daily basis
Crawler-mounted boom lifts rise to the challenge of bridge work
From remote creek beds to inner city overpasses, crawler-mounted boom lifts are proving indispensable for bridge construction, inspection and maintenance