ai01020719.xml

Premium Content

15 April 2008

Hek mast climbers on the new 185 m high customer services building being built for the Emirates Telecommunications Corp in Dubai, UAE. Ten Hek MSM Super mast climbers, supplied by Al Laith Scaffolding to main contractor Dhabi Contracting, are being used to install the heavy granite panels on the sheer walls of the tower. The glass panel sections are being installed from inside the building. The MSM units comprise six single–mast platforms at heights of up to 185 m and two twin–mast units up to 80 m. Anchoring is at 8 m centers.

Accessing aging infrastructure: Choosing the right AWP for the application
How site conditions determine which aerial work platform is best suited to the project
The evolution of construction site safety: Why smart machines matter
Intelligent intervention that can help contractors prevent incidents without compromising productivity
How smart equipment is improving jobsite productivity
In the face of rising costs, tighter margins and labor shortages, there has never been a greater need to make the best use of every hour on site