Australian port chooses Barin

03 February 2014

The Barin AB 16/S underbridge inspection unit at work on the Dalrymple Bay Coal Terminal in Australi

The Barin AB 16/S underbridge inspection unit at work on the Dalrymple Bay Coal Terminal in Australia

An underbridge inspection unit from Italian manufacturer Barin is working on Australia’s Dalrymple Bay Coal Terminal (DBCT).

The specially designed unit, a Barin AB 16/S, is being used to assist maintenance crews checking the underside of the 3.8 km jetty at the port. The unit is truck-mounted on a Scania P400 Lb 8x4 HNB chassis and has a bucket-type aerial platform with a capacity of 300 kg, which can work both underbridge and overhead.

The unit, sold to DBCT by Barin’s exclusive distributor for Australia, Lincoln Hire, has a maximum horizontal underbridge reach of 16m and a maximum overhead reach of 21.5 m.

DBCT is part of the world’s largest coal export port in Australia and exports thermal and metallurgical coal from central Queensland’s Bowen Basin Mines to ports around the world. The terminal operates around the clock and has a capacity of 85 MTPA.

Latest News
Atlas crane dealer appointed in Ukraine
New and used crane dealer and rental company to distribute Atlas loader cranes
Link-Belt’s 65|RT delivers power and precision on transmission project
The rough terrain crane has been integral to setting rebar cages and anchor bolt cages into 17 drilled pier foundations.
Friday roundup: smarter and safer transport; China’s new towers; defying the slowdown; Tadano promises surprises
This week’s CTB covered making transport safer, Chinese tower cranes and the strong market in North America