Barin assists Brazil power plant build

Premium Content

12 June 2014

The Barin ABC 60/L at work at the Jirau hydroelectric power plant in Porto Velho, Brazil

The Barin ABC 60/L at work at the Jirau hydroelectric power plant in Porto Velho, Brazil

Brazilian rental firm Rentalvale Equipamentos has hired out a Barin ABC 60/L bridge inspection unit to work on construction works at the Jirau hydroelectric power plant in Porto Velho.

Currently under development on the Madeira River, the Jirau plant will have an installed capacity of 3750 MW.

The Barin ABC 60/L is mounted on a 2-axle Iveco Daily 70C16 truck chassis. The platform offers an underbridge working length of 6 m with a total payload of 300 kg.

The evolution of electromobility in construction
The case for electric construction equipment is now as much about productivity and business value as it is about sustainability
Why crawler AWPs are becoming essential to modern mining and tunnelling
While excavators, loaders and TBMs dominate the spotlight, crawler aerial work platforms are quietly transforming how mining and tunnelling projects are built, maintained and operated.
Beyond the logo: Why content is the engine of successful B2B brand transformation
KHL Content Studio’s Jon Abrahams on how a new identity may capture attention, but it’s understanding that builds trust