Barin underbridge heads to Bangalore

Premium Content

19 December 2016

Barin AB 12/S during commissioning training in December.

Barin AB 12/S during commissioning training in December.

A new AB 12/S bucket type underbridge inspection unit from Barin is operating in India.

Bangalore’s Planning & Road Asset Management Centre (Pramc) and the Public Works, Ports & Inland Water Transport Department (PWP&IWTD) chose the Barin model mounted on a 3-axle Volvo FM330 Hp 6x2 rigid truck chassis.

As with all in Barin’s range, the AB 12/S uses one lane of the highway in transport position and in work configuration.

Features of the machine included a bridge barrier clearance of 3.5m, a sidewalk clearance of 3m, horizontal outreach underbridge of 12m and a vertical depth underbridge of 16.5m. maximum overhead outreach is 15.2m, while bucket capacity 280 kg and GVW is 16 tonnes.

Latest News
New head of KHL’s Content Studio discusses how people make decisions on what to buy
Jon Abrahams describes why industry stalwarts and disruptors alike should consider adding content marketing to their business strategies
Crane Institute of America appoints L.D. Stutes as GM
Stutes enters this newly created position with 37 years of experience.