Besix to start construction of seven bridges in Gabon

A bridges in Cameroon on which Besix has already worked together with Matiere/Metallic Bridges of Belgium A bridges in Cameroon on which Besix has already worked together with Matiere/Metallic Bridges of Belgium (Image courtesy of Besix)

A consortium of contractors led by Belgian-French construction company Besix is set to start construction of seven bridges in Gabon.

The joint venture, which also involves Metallic Bridges of Belgium and Matiere, won a deal to build the bridges last year but the start of construction had to wait until funding was in place and the project reached financial close.

The for the Gabonese Ministry of Public Works and Infrastructure consists of:

  • Designing and building two 200-metre flyovers in Libreville, the Gabonese capital, to improve traffic flow.
  • Constructing a 200-metre-long steel bridge across the Abanga River in Ebel, a city located on the Transgabonese road, replacing the existing bridge.
  • Building four pedestrian bridges in Libreville to enhance pedestrian safety around schools and markets.

Besix will perform all civil works and the installation of the bridges. Matiere, through its Belgian subsidiary MBB, will supply all the steel structures. The companies have previously partnered on the Pont de l’Enfance bridge and the Mungo bridge in Cameroon.

Quentin Olivier, business development manager at Besix, said, “Besix is proud to undertake this project, which will significantly improve traffic flow, safety, and ultimately, the regional and national economy. As the consortium leader, Besix actively supported the Gabonese government in securing the financing. This involved collaboration with the Belgian export credit agency Credendo and Besix’s long-standing financial partners.”

Latest News
Another record claimed for 4,000 tonne crane
XCMG crawler crane, now with a luffing jib, builds 18 MW offshore wind turbine, on shore
Fehmarnbelt Tunnel project reaches milestone
All five production lines for standard tunnel elements are now in operation at what will be the longest immersed tunnel in the world
Canadian challenge for Liebherr tower crane
81 K.1 works in limited space on Vancouver Island