Hyundai’s US$ 5 billion deal for Russian factory

05 September 2016

A consortium led by Hyundai Engineering has won a KRW 5.6 trillion (US$ 5.16 billion) contract to build fertilizer plants in Kozmino in Nakhodka, Russia.

Along with Hyundai E&C and the Japanese engineering firm Toyo, Hyundai Engineering will build two ammonia production plants with a combined daily capacity of 6,700 tonnes, two urea plants with combined daily capacity of 6,100 tonnes, and a methanol plant with a daily capacity of 3,000 tonnes.

The deal was signed following a meeting of the Korean president Park Geun-hye and her Russian counterpart Vladimir Putin in Vladivostok.

The consortium, which was selected as a preferred bidder for the plants in September 2014, was awarded the contract by Russia’s Nakhodka Mineral Fertilizers Factory, a subsidiary of the National Chemical Group.

The construction of the plants is set to be completed in 62 months.

Latest News
ARA forecasts “soft landing” at Working at Height Conference
Chief economist shares forecasts with Working at Height at delegates in Nashville yesterday 
Wolff tower cranes work out in Norway
Five flat top tower cranes are helping to rejuvenate an industrial district of Oslo
NessCampbell debuts North America’s first Grove GMK6450-1
NessCampbell Crane + Rigging partnered with Western Towboat to assemble a new towboat at its Seattle facility.