Barin assists Brazil power plant build

Premium Content

12 June 2014

The Barin ABC 60/L at work at the Jirau hydroelectric power plant in Porto Velho, Brazil

The Barin ABC 60/L at work at the Jirau hydroelectric power plant in Porto Velho, Brazil

Brazilian rental firm Rentalvale Equipamentos has hired out a Barin ABC 60/L bridge inspection unit to work on construction works at the Jirau hydroelectric power plant in Porto Velho.

Currently under development on the Madeira River, the Jirau plant will have an installed capacity of 3750 MW.

The Barin ABC 60/L is mounted on a 2-axle Iveco Daily 70C16 truck chassis. The platform offers an underbridge working length of 6 m with a total payload of 300 kg.

Latest News
New head of KHL’s Content Studio discusses how people make decisions on what to buy
Jon Abrahams describes why industry stalwarts and disruptors alike should consider adding content marketing to their business strategies
Crane Institute of America appoints L.D. Stutes as GM
Stutes enters this newly created position with 37 years of experience.