London 2012: Aquatics Centre roof lift

08 May 2009

Work is under way lifting the 2800-tonne wave-shaped roof of the Zaha Hadid designed London 2012 Aquatics Centre. The lift is considered one of the most complex engineering and construction challenges of the Olympic Park ‘big build’. When complete the 160 m long column-free and up to 90 m wide roof will rest on two concrete supports at the northern end and a 28 m long and 5 m wide, supporting ‘wall’ at its southern end.
Latest News
Crane Institute of America appoints L.D. Stutes as GM
Stutes enters this newly created position with 37 years of experience.
Navigating new immigration policies in the construction industry
Joel Dandrea discusses what construction contractors need to know.
Link-Belt veteran William “Skeeter” Collins announces retirement
Collins, a cornerstone of Link-Belt Cranes’ sales team for over 50 years, will retire in February 2025